Description
Propellers and stern drives.
The application should be carried out in dry and well ventilated place as moisture may cause a dull finish and slow drying process. The surface to be coated should be adequately prepared by removing traces of loose or flaking paint, grease, rust, dust and any contamintion which could affect the final result. Product should be sprayed in an horizontal way at first and after in a vertical way. Allow at least 10 minutes drying between coats for “wet on wet” applications. Repeat few times application in thin layers. Hold the spray can in a vertical position at a distance of at least 20-25 cm. For best result apply product at a temperature of at least 20°C. Shake cans for at least one minute before each application. In case of continuous application stop and shake cans from time to time. In case of obstruction of the nozzle this can be cleaned simply by sinking the part into a solvent for a few minutes. Once the application has been completed turn the spray can upside down and keep spraying for a few seconds ( this will allow the special self cleaning valve to complete the cleaning process of internal pipe).
Application | Spray |
Spray | Ready for use |
Touch dry | approx.15-20 minutes |
Dust dry | 15 minutes (20c) |
Launching time | Min 24-48 hours |
Recoat time | min. 8-12 h (20°c) |
Application temperature | Between +10 C and +40 C |
Relevant humidity | Less than 80% |
Dry film thickness advised | 20-30 microns |
Theoret. coverage m2/Lt | 2-4 |